![]() |
| Bank Stabilization |
LaCas Consultants Inc. carried out a field assessment of the erosion protection works at the entrance of the Gates River Fish Hatchery. Hydraulic calculations were carried out to design the river training works for a 30m wide bridge waterway opening. LaCas Consultants Inc. carried out final engineering construction inspection of the works.